SUTOR Global s.r.o. participated in the ZEBRA project, which represents the construction of a new production unit for the manufacture of 4th generation F-gas intermediates with low GWP (Global Warming Potential).
The project also included optimization of existing operations and construction of new auxiliary facilities, thereby strengthening the capacity, energy efficiency, and environmental sustainability of SPOLCHEMIE Zebra a.s. production in Ústí nad Labem.
The project was implemented in 2024 and included complete thermal and cold insulation of piping, equipment, and facilities, including splash protection insulation.
SUTOR Global provided supply, installation, and complete technical preparation of the entire insulation system in the form of a turnkey delivery.
Main activities included:
- Development of insulation project documentation
- Supply and installation of thermal and cold insulation for piping systems, fittings, special fittings, and equipment
- Cladding of insulated parts on the exterior side
- Provision and construction of scaffolding for all installation phases
This implementation was carried out in accordance with strict requirements for safety, quality, ecology, and long-term durability of insulation in chemical operations.
Project investor: SPOLCHEMIE Zebra a.s., Ústí nad Labem
Client: SPOLCHEMIE Zebra a.s., Ústí nad Labem
Project implementation: SUTOR Global s.r.o.
Location: Ústí nad Labem
Timeline: 2024
Scope of activities: Project documentation, supply and installation of insulation, cladding, scaffolding
Type of insulation: Thermal, cold, and protective splash protection insulation
The ZEBRA project is a significant step toward more sustainable and environmentally friendly production of fluorinated gases that meet modern environmental standards and provide a lower carbon footprint.
Through professional approach, precise planning, and close cooperation with the client, SUTOR Global confirmed its position as a reliable partner for insulation work in the chemical industry.