Rolling Mill Control Room Renovation

SUTOR Global s.r.o. served as the main contractor for the comprehensive renovation of control room K 2.2 at the billet rolling mill in Buštěhrad. The project focused on the modernization and renewal of the rolling mill control cabin, resulting in improved safety, operator comfort, operational reliability, and extended technological equipment lifespan.
The implementation included complete coordination of mechanical, construction, insulation, metalwork, painting, and electrical activities.

The renovation took place from September 15, 2025 to October 4, 2025, during which the rolling mill operations were suspended. Thanks to precise preparation and cooperation of all parties involved, the reconstruction was completed in a record time of 20 days, and the control room was handed over for recommissioning on October 6, 2025.

Project Investor: TŘINECKÉ ŽELEZÁRNY, a.s.

Client: TŘINECKÉ ŽELEZÁRNY, a.s.

Project Implementation: SUTOR Global s.r.o., AIRS s.r.o.

Location: Billet Rolling Mill, Buštěhrad

Implementation Period: 15. 9. 2025 – 4. 10. 2025

Operations Start: 6. 10. 2025

Control Room Technical Parameters: approximate dimensions 4 × 12.5 × 4 m

Construction Duration: 20 days

This renovation resulted in improved working conditions for operators, enhanced safety standards, and modernized control infrastructure of the entire billet rolling mill. The project exemplifies successful coordination of multiple technical trades within a short timeframe and confirms SUTOR Global’s capability to provide comprehensive services from dismantling to final electrical installation.