{"id":11342,"date":"2025-11-13T14:17:55","date_gmt":"2025-11-13T13:17:55","guid":{"rendered":"https:\/\/www.sutorglobal.com\/reference\/slope-stabilization-strazky\/"},"modified":"2025-11-13T14:17:57","modified_gmt":"2025-11-13T13:17:57","slug":"slope-stabilization-strazky","status":"publish","type":"reference","link":"https:\/\/www.sutorglobal.com\/en\/reference\/slope-stabilization-strazky\/","title":{"rendered":"SLOPE STABILIZATION STR\u00c1\u017dKY"},"content":{"rendered":"\n<p><strong>SUTOR Global s.r.o. \u2013 Construction Division<\/strong> implemented the project for <strong>slope stabilization of the embankment body of road III\/25114 (in the direction of Chomutov)<\/strong>.<br\/>The objective of the project was to <strong>ensure slope stability<\/strong> and <strong>restore functional parameters of the road<\/strong> through reinforcement and drainage of the embankment body over a&nbsp;length of approximately <strong>440 meters<\/strong>.<\/p>\n\n<p>The project was implemented as a&nbsp;<strong>general construction contract<\/strong> during the period <strong>June \u2013 October 2024<\/strong> and included the following main activities:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Geodetic works<\/strong> \u2013 surveying and site layout<\/li>\n\n\n\n<li><strong>Slope stabilization with quarry stone<\/strong> including <strong>construction of retaining walls<\/strong> and <strong>stone thresholds<\/strong>, which serve to avoid interventions on adjacent properties<\/li>\n\n\n\n<li><strong>Slope drainage with drainage piping<\/strong> and stormwater management<\/li>\n\n\n\n<li><strong>Earthworks<\/strong> \u2013 excavation, backfilling, fill material, and shoulder adjustments<\/li>\n\n\n\n<li><strong>Slope reinforcement with stone riprap<\/strong> including aggregate wedging<\/li>\n\n\n\n<li><strong>Slope establishment and seeding by manual sowing<\/strong><\/li>\n\n\n\n<li><strong>Installation of H1 road barriers<\/strong> over a&nbsp;length of nearly <strong>460 meters<\/strong><\/li>\n\n\n\n<li><strong>Implementation of traffic engineering measures (TEM)<\/strong> including tree removal<\/li>\n<\/ul>\n\n<p>The total volume of quarry stone riprap was more than <strong>1,500 m\u00b3<\/strong>, using aggregate fraction <strong>300\u2013600 mm<\/strong>.<\/p>\n\n<p><strong>Project details<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Project investor:<\/strong> AQUA zemn\u00ed pr\u00e1ce s.r.o.<\/li>\n\n\n\n<li><strong>Client:<\/strong> AQUA zemn\u00ed pr\u00e1ce s.r.o.<\/li>\n\n\n\n<li><strong>Project implementation:<\/strong> SUTOR Global s.r.o. \u2013 Construction Division<\/li>\n\n\n\n<li><strong>Location:<\/strong> Str\u00e1\u017eky \u2013 road III\/25114<\/li>\n\n\n\n<li><strong>Implementation period:<\/strong> June \u2013 October 2024<\/li>\n\n\n\n<li><strong>Contract value:<\/strong> 5.8 million CZK excluding VAT <\/li>\n\n\n\n<li><strong>Delivery method:<\/strong> General contractor<\/li>\n<\/ul>\n\n<p>The slope stabilization in Str\u00e1\u017eky ensures <strong>long-term stability of road III\/25114<\/strong>, protects adjacent properties from landslides and erosion, and increases road traffic safety.<br\/>The project was completed <strong>on time, in prescribed quality and in accordance with the signed construction contract<\/strong>, which was confirmed by the client <strong>AQUA zemn\u00ed pr\u00e1ce s.r.o.<\/strong><\/p>\n\n<p><\/p>\n","protected":false},"featured_media":11343,"template":"","kategorie-referenci":[83,82],"class_list":["post-11342","reference","type-reference","status-publish","has-post-thumbnail","hentry","kategorie-referenci-homepage","kategorie-referenci-other-industry"],"_links":{"self":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media\/11343"}],"wp:attachment":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media?parent=11342"}],"wp:term":[{"taxonomy":"kategorie-referenci","embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/kategorie-referenci?post=11342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}