{"id":11336,"date":"2025-11-13T14:17:45","date_gmt":"2025-11-13T13:17:45","guid":{"rendered":"https:\/\/www.sutorglobal.com\/reference\/scaffolding-works-excavator-1320-k110\/"},"modified":"2025-11-13T14:17:45","modified_gmt":"2025-11-13T13:17:45","slug":"scaffolding-works-excavator-1320-k110","status":"publish","type":"reference","link":"https:\/\/www.sutorglobal.com\/en\/reference\/scaffolding-works-excavator-1320-k110\/","title":{"rendered":"SCAFFOLDING WORKS &#8211; EXCAVATOR 1320\/K110"},"content":{"rendered":"\n<p><strong>SUTOR Global s.r.o.<\/strong> carried out extensive <strong>scaffolding works<\/strong> for <strong>PRODECO a.s.<\/strong> during <strong>July-November 2024<\/strong> at the <strong>DNT Tu\u0161imice<\/strong> site.<br\/>The contract was part of the <strong>technological replacement of anchor cables<\/strong> on the <strong>SchRS 1320\/K110 excavator<\/strong>, which is among the key equipment for mining and material transfer in the brown coal district.<\/p>\n\n<p>The project included <strong>complete provision of scaffolding structures<\/strong> for safe access of workers to individual parts of the excavator during the anchor cable replacement.<\/p>\n\n<p>Main activities:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Design and implementation of scaffolding structures<\/strong> based on the technological procedure provided by the client<\/li>\n\n\n\n<li><strong>Assembly and disassembly of spatial scaffolding<\/strong> on the load-bearing parts of the machine, including arms and cabin<\/li>\n\n\n\n<li><strong>Ensuring safe access to high-elevation sections<\/strong> of the excavator while maintaining operational stability of the structure<\/li>\n\n\n\n<li><strong>Cooperation with the main contractor PRODECO a.s.<\/strong> in coordinating individual stages of cable replacement<\/li>\n<\/ul>\n\n<p>All work was carried out under strict safety measures and in compliance with <strong>OHS requirements and internal regulations of DNT Tu\u0161imice operations<\/strong>.<\/p>\n\n<p><strong>Project details<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Client:<\/strong> PRODECO a.s.<\/li>\n\n\n\n<li><strong>Project implementation:<\/strong> SUTOR Global s.r.o.<\/li>\n\n\n\n<li><strong>Location:<\/strong> DNT Tu\u0161imice<\/li>\n\n\n\n<li><strong>Implementation period:<\/strong> July &#8211; November 2024<\/li>\n\n\n\n<li><strong>Scope of work:<\/strong> Scaffolding works during anchor cable replacement on SchRS 1320\/K110 excavator<\/li>\n<\/ul>\n\n<p>Through this project implementation, <strong>SUTOR Global<\/strong> confirmed its <strong>technical and organizational capabilities<\/strong> in <strong>industrial scaffolding<\/strong> for work on large-scale machinery and technological units.<br\/>Thanks to <strong>precise preparation, safe execution, and timely completion<\/strong>, the continuity of major repairs and operational reliability of the equipment were ensured after the anchor cable replacement.<\/p>\n","protected":false},"featured_media":11337,"template":"","kategorie-referenci":[80],"class_list":["post-11336","reference","type-reference","status-publish","has-post-thumbnail","hentry","kategorie-referenci-mining-industry"],"_links":{"self":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11336\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media\/11337"}],"wp:attachment":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media?parent=11336"}],"wp:term":[{"taxonomy":"kategorie-referenci","embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/kategorie-referenci?post=11336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}