{"id":11292,"date":"2025-11-13T14:16:34","date_gmt":"2025-11-13T13:16:34","guid":{"rendered":"https:\/\/www.sutorglobal.com\/reference\/rolling-mill-control-room-renovation\/"},"modified":"2025-11-13T14:16:37","modified_gmt":"2025-11-13T13:16:37","slug":"rolling-mill-control-room-renovation","status":"publish","type":"reference","link":"https:\/\/www.sutorglobal.com\/en\/reference\/rolling-mill-control-room-renovation\/","title":{"rendered":"Rolling Mill Control Room Renovation"},"content":{"rendered":"\n<p><strong>SUTOR Global s.r.o.<\/strong> served as the main contractor for the comprehensive renovation of control room K&nbsp;2.2 at the <strong>billet rolling mill in Bu\u0161t\u011bhrad<\/strong>. The project focused on the <strong>modernization and renewal of the rolling mill control cabin<\/strong>, resulting in improved <strong>safety, operator comfort, operational reliability<\/strong>, and extended <strong>technological equipment lifespan<\/strong>.<br\/>The implementation included complete coordination of mechanical, construction, insulation, metalwork, painting, and electrical activities. <\/p>\n\n<p>The renovation took place from <strong>September 15, 2025 to October 4, 2025<\/strong>, during which the rolling mill operations were suspended. Thanks to precise preparation and cooperation of all parties involved, the reconstruction was completed in a&nbsp;record time of 20 days, and the control room was handed over for recommissioning on <strong>October 6, 2025<\/strong>. <\/p>\n\n<p><strong>Project Investor:<\/strong> T\u0158INECK\u00c9 \u017dELEZ\u00c1RNY, a.s.<\/p>\n\n<p><strong>Client:<\/strong> T\u0158INECK\u00c9 \u017dELEZ\u00c1RNY, a.s.<\/p>\n\n<p><strong>Project Implementation:<\/strong> SUTOR Global s.r.o., AIRS s.r.o.<\/p>\n\n<p><strong>Location:<\/strong> Billet Rolling Mill, Bu\u0161t\u011bhrad<\/p>\n\n<p><strong>Implementation Period:<\/strong> 15.&nbsp;9.&nbsp;2025 &#8211; 4.&nbsp;10.&nbsp;2025<\/p>\n\n<p><strong>Operations Start:<\/strong> 6.&nbsp;10.&nbsp;2025<\/p>\n\n<p><strong>Control Room Technical Parameters:<\/strong> approximate dimensions 4 \u00d7 12.5 \u00d7 4&nbsp;m<\/p>\n\n<p><strong>Construction Duration:<\/strong> 20 days<\/p>\n\n<p>This renovation resulted in <strong>improved working conditions for operators<\/strong>, <strong>enhanced safety standards<\/strong>, and <strong>modernized control infrastructure<\/strong> of the entire billet rolling mill. The project exemplifies successful coordination of multiple technical trades within a&nbsp;short timeframe and confirms <strong>SUTOR Global&#8217;s<\/strong> capability to provide <strong>comprehensive services from dismantling to final electrical installation<\/strong>. <\/p>\n","protected":false},"featured_media":10734,"template":"","kategorie-referenci":[83,81],"class_list":["post-11292","reference","type-reference","status-publish","has-post-thumbnail","hentry","kategorie-referenci-homepage","kategorie-referenci-metallurgical-industry"],"_links":{"self":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/reference\/11292\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media\/10734"}],"wp:attachment":[{"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/media?parent=11292"}],"wp:term":[{"taxonomy":"kategorie-referenci","embeddable":true,"href":"https:\/\/www.sutorglobal.com\/en\/wp-json\/wp\/v2\/kategorie-referenci?post=11292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}